"Space optimization and complete remodeling."
1. Project Approval:
Development of the renovation project, authorization for reconfiguration of engineering systems and relocation of plumbing points.
2. Dismantling:
Removal of tiles, ceilings, floor coverings. Dismantling of old plumbing. Packing of debris, protection of communications.
3. Electrical and water supply:
Complete replacement of wiring, installation of additional lighting. Relocation of plumbing fixtures, installation of boiler, revision of air conditioners.
4. Screed and waterproofing:
Floor leveling, waterproofing of bathrooms and adjoining walls.
5. Ceilings and finishes:
Installation of ceilings, lighting, ventilation. Painting of walls, installation of technical hatches, installation of alarm systems.
6. Completion of repairs:
Installation of kitchen, flooring, plumbing, doors. Final assembly of furniture and installation of household appliances.