Designer Apartment Renovation in Dubai Marina

Share

Work performed

"Space optimization and complete remodeling."

1. Project Approval:
Development of the renovation project, authorization for reconfiguration of engineering systems and relocation of plumbing points.

2. Dismantling:
Removal of tiles, ceilings, floor coverings. Dismantling of old plumbing. Packing of debris, protection of communications.

3. Electrical and water supply:
Complete replacement of wiring, installation of additional lighting. Relocation of plumbing fixtures, installation of boiler, revision of air conditioners.

4. Screed and waterproofing:
Floor leveling, waterproofing of bathrooms and adjoining walls.

5. Ceilings and finishes:
Installation of ceilings, lighting, ventilation. Painting of walls, installation of technical hatches, installation of alarm systems.

6. Completion of repairs:
Installation of kitchen, flooring, plumbing, doors. Final assembly of furniture and installation of household appliances.

Design project

Before/after comparison

После
До
После
До
ru_RU

Estimating the cost of repairs

Showroom visit

Book a call