Townhouse Renovation in The Springs: Major Remodel Before & After

Share

Work performed

"Reconstruction with Complete Replacement of Engineering Systems"

1. Project Preparation:
Obtaining permits, coordinating the relocation of utility lines, and preparing technical documentation.

2. Dismantling:
Removal of old finishes, coverings, and ceilings. Disposal of construction debris. Protection of existing engineering systems.
Disconnection of water and electricity supply during the work period.

3. Installation of New Utilities:
Replacement of electrical wiring, adding outlets and switches. Reconfiguration of water supply and sewage systems, installation of floor drains and risers, and boiler installation. Inspection and replacement of air conditioners.

4. Base Preparation:
Leveling floors, pouring cement screed, and installing waterproofing in bathrooms and wet areas, including walls adjacent to living spaces.

5. Ceilings, Painting, and Lighting:
Installation of ceilings on a metal frame with access hatches and outlets for lighting, ventilation, and smoke detectors. Painting of walls.

6. Finishing and Interior Assembly:
Installation of doors, floor coverings, kitchen units, and bathroom equipment. Completion of works with furnishing, appliance placement, and textiles.

Before/after comparison

После
До
После
До
ru_RU

Estimating the cost of repairs

Showroom visit

Book a call